Rubbish Chute System Price

 

 

 

What is Rubbish Chute for removal Debris ?

Rubbish Chute for debris removal is placed in residential building

 

 

The Zagros Rubbish Chutes are a system for global use. They use all the benefits of HDPE plastic: they are very silent, easy to set up, safe and also have a light- weight, facilitating transport and assembly/disassembly.

 

Highly impact-resistant materials, 6 to 7.5 mm material thickness and additional 3 mm wearing ribs on the low/wear Zagros Rubbish Chute ensure an extremely long service life compared to conventional chutes. They are connected with double hooks to ensure secure attachment of the rubbish chutes – whether for use on floors, scaffolding, pitched roofs or flat roofs. A wide selection of different fastening elements ensures shortest possible setup times and efficient working. The range of convenient accessories allows dust-free working as well as simultaneous working at several stories.

Rubbish chute is a device for easy, safe, cost-effective and fast removal of debris from floor to the ground. 

Zagros Concrete Formwork Company, a manufacturer of  concrete formwork system plastic formwork or steel formwork, forms and tools, is proud to include equipment such as plastic waffle slab formwork, Ribbed Slab formwork (Light Form formwork), plastic concrete formwork for concrete walls and columns (Plastic concrete Formwork .) and 3D Drainage Panels for Roof Garden in its production portfolio, in addition to producing rubbish chute tool.

Zagros Plast Company, a manufacturer of Rubbish chute is located in Middle East region with two office in Dubai and Iraq and it is possible to easily send rubbish chute to all parts of Iran.

 

characteristic and height and weight of Rubbish chute

Main components of Rubbish Chute:

1- Hopper or inlet of the debris chute (Hopper of Rubbish Chute)

2- Chutes of rubbish chute

3- Metal bracket or metal support of Rubbish Chute

4- Chain connections of debris chute devices (including chains, bolts, shackles, dynamo hooks)

 

most common question about Rubbish Chute System: 

"How many chutes and hoppers are required per story and how much does the price of all the devices on one floor cost?"

 

If the height of the project floors or the floor-to-floor height of the project floor is 3.5 meters:

One hopper (Hopper)
Three Tube or chutes (Chutes)
One Number of Metal Support
One Set of Chain Connections

 

If the height of the project floors and floor to floor of the project floor is 4 meters:

1 Hopper or inlet
4 Buckets or Chutes
1 Metal Bracket or Support to take the rubbish chute weight
1 Set of Chain Connections for 4 meter height floor 

 

Please contact us for advice on purchasing a rubbish chute:

Whatsapp : 00989106730326

                 00989129216960 

 

It is a set of inlet (Hopper) and bucket (Chute) that is used to discharge waste (during renovation) from floors.

Rubbish chute  has much higher safer than traditional methods of discharging debris from floors. In the traditional method of discharging debris from a building, a electrical lift-tools and a number of workers were used, which has always caused irreparable damage to debris in this way. On the other hand, this rubbish chute can be very effective in reducing and eliminating dust during the unloading of debris removal because the path of transporting debris and waste from the roof and story levels to the loading location is completely enclosed and dust cannot escape from this cylindrical environment.

 

In the process of changing the decoration and renovation of a residential unit, the main concern of using Rubbish chuting is to eliminate the noise caused by the unloading and not to spread dust in the residential space, which can affect the lives of other residents of the building.

  Rubbish Chute devices is presented below:

 Rubbish chute system is deployed on 10 stories building

Advantages of the Rubbish chute over the traditional manner of evacuation:

  • High speed of installation on floors
  • Affordable cost of the rubbish chute .
  • High safety of evacuation with the rubbish chute .
  • Very low noise of evacuation of rubbish chute .

The rubbish chute (rubbish chute) produced by Zagros Plast Company is the right option for the safe evacuation of waste and debris. The raw material for the production of rubbish chute (rubbish chute) is HDPE, which shows good resistance to the impact shock caused by falling debris.

Due to the use of high-quality materials, the rubbish chute (rubbish chute) produced by Zagros company dampens the sound caused by the debris hitting the body of the rubbish chute, and this leads to a significant reduction in the noise of evacuation of rubbish from floors. The installation of waste chute is very easy, so that with a few photos and videos provided to the customer, the installation work is done quickly.

connections of rubbish chute system to each other with chain

    In addition, Zagros Company considers it its duty to address the customer's concerns in this regard regarding the introduction of installers and support for the installation of rubbish chute (waste chutes). The approximate cost of installing each floor of the rubbish chute is about $40 for each floor.

How many buckets and entrances (hoppers) does each project need?

One of the important questions from customers is the number of entrances and the number of chutes required for the project's rubbish chute ..

As a general rule, it can be said that each floor with a height of about 3.5 meters requires 3 chutes (buckets) and 1 entrance (hopper). The construction rubbish chute can be installed on the wall, scaffolding and on the ceiling of each floor, which can be installed with bolts and rods or welding.

rubbish chute system metal bracket is setting on the floor

The connection of the rubbish chute assembly is done with a  hook, shackle, screw, nut and washer and finally a chain, which leads to a very high installation speed (compared to wire rope and rivets).

 

Specifications of the construction rubbish chute (waste chute):

Height (cm):130 cm

Upper diameter (cm): 60 cm

Bottom diameter (cm): 40 cm

Weight (kg): 14 kg

 

The effective height of the rubbish chute or bucket of the waste chute . of Zagros Company is a point of distinction from other manufacturers. Due to the higher height of the waste chute . components produced by Zagros Company, it is possible to perform construction rubbish chute evacuation more cheaply due to the reduction in the number of required components.

 

Components of a construction waste chute:

As mentioned above, a construction rubbish chute has four main components:

1- Metal bracket or support for the chute:

The first component in installing a chute is a metal bracket that is attached to the ceiling with a grade 10 roll bolt.

 

Price per floor of building waste shooting:
The price of items and the implementation of the construction waste chute is one of the most important factors in choosing this waste discharge . over other methods. As mentioned, to implement a typical floor with a height between 3.2 meters and 3.5 meters, you need (price update in spring 1404)

1 hopper with a cost of 3,100,000 Tomans

3 buckets totaling 7,500,000 Tomans

1 metal bracket with a cost of 2,250,000 Tomans

1 set of fittings required for one floor with a cost of 2,500,000 Tomans

In other words, the cost of the above items for one floor is about 15,350,000 Tomans, which, assuming a building with, for example, 10 floors, the cost of construction waste chute items for it is about 153,000,000 Tomans.

How to produce a building waste chute:
The garbage chute . is produced with a rotational molding .. The garbage chute . can be installed on scaffolding and scaffolding, installed on a metal plate of the facade, and can also be rolled bolted to the roof floor or roof ledge.

What are the characteristics of a quality garbage chute?
Construction debris chute must have the following features to ensure its quality:

Ensuring high flexibility of plastic debris chute tools
Refuse chute made of HDPE or heavy density polyethylene raw materials
Weight of each piece of garbage chute bucket and hopper is approximately 10 to 13 kg
The minimum cross-sectional diameter of the garbage chute (garbage chute . bucket) is 50 cm
The diameter of the hole above the hopper or garbage chute entrance (Hopper Rubbich Chute) is approximately 110 cm for easy entry of construction debris
Very easy installation of garbage chute and chain connection of the chute to each other

Introduction to Rubbish Chute
The garbage chute . provided by Beton Baspar Sanat Company is a powerful, simple method for managing the evacuation of construction debris in the construction industry as well as various types of construction demolition sites and interior decoration changes. The chute or bucket (Chute) of the garbage chute . is designed and manufactured from first-class petrochemical raw materials, with durability and high impact resistance against impacts caused by construction debris. Using high-quality raw materials is the most important point in having a durable garbage chute . on a construction site that is going to be continuously and continuously subjected to impacts caused by construction debris.

Is heavier garbage chute of higher quality?

Some manufacturers of construction garbage chute claim that the reason for the higher quality of their production . is the higher weight of the garbage chute components. In general, the weight criterion is not a correct criterion for the superiority of the quality of the construction garbage chute ..

The most important criterion for garbage chute quality:

1- The quality of raw materials and the quality of raw materials (Raw Materials for Rubbish Chute) in the garbage chute . is the most important factor in quality. For example, suppose that the input of a company's garbage chute (Hopper) weighs 15 kg and another company produces a garbage chute weighing 12 kg. If a company with a lighter trash shooting hopper uses higher quality materials, it has spent more money on producing the trash shooting hopper due to the higher price of raw materials, and the claim that higher weight equals better quality is completely questionable.
One way to increase the weight of plastic parts in the plastics industry is to add calcium carbonate powder to the plastic batching and injection ., which has unfortunately been misused recently. So if the goal is simply to increase the weight of the trash shooting, this can be achieved for those trash shooting manufacturers by simply adding some calcium carbonate powder.

2- Design of Plastic Trash Shooting Equipment (Rubbish Chute Design): Proper design of the trash shooting chute wall is very important in withstanding the impacts caused by the shot. Also, the area where the chute and bucket are hit by the construction debris should be slightly thicker than other areas. The majority of the rubbish chute available on the market has the same thickness in different areas of the rubbish chute, both impact and non-impact, which leads to an unnecessary increase in the weight of the rubbish chute ..

Other positive aspects of the construction rubbish chute produced by Beton Baspar Company include a convenient depot with the lowest occupancy level and easy installation of the rubbish chute. Using the rubbish chute leads to an increase in the speed of work execution on the construction site and the cleanliness of the workforce.

Safety and Efficiency of the Rubbish Chute .:
Comparing the price of the construction rubbish chute (construction rubbish chute) and the number of workers and electric hoists required to move the rubbish of a 10-story building, the result is that the rubbish chute is a very safe and cost-effective option for moving construction rubbish. It is also important to note that the risk of life risks and possible side effects on workers is greatly reduced.

Rubbish Chute for debris removal in United Arab Emirates

Insert Comment
Review title:
your name :
email :